SECTOR II Synchronization Diagrams

SECTOR II Synchronization Diagrams



    • Related Articles

    • Sector 2 Installation Manual

      Please find attached the installation manual for the Sector 2 boom barrier, which includes the following sections: Glossary of terms Product identification Physical installation Onsite electrical wiring Basic controller setup Installation handover ...
    • How do I override Auto FRX on Sector Controllers

      Wiring: Programming: 1. Under Chrono-guard menu select Auto XIO 2. Select start time and end time (Ex. Start: MTWTF 07:00, End: MTWTF 17:00) 3. Invert logic OFF 4. Remote learned in as a Latch on the receiver. Basic Operation: When XIO is active ...
    • RDO II Installation Manual

      Please find attached the installation manual for the RDO 11 garage operator, which includes the following sections: Safety Instructions Month carry-in product warranty Operator Installation Configuration Wiring diagrams Functionality Kindly refer to ...
    • Aux Overload (Sector)

      Possible Causes This error indication is displayed in the event of excess current being drawn. • Incorrect spring orientation • Incorrect spring tension • Too many auxiliary components connected to 12V auxiliary output • The maximum current that ...
    • Sector II – Flux SA Safety Loop Diagram